Year | Event |
1914 | Established as UBE SHINKAWA IRON WORKS as unlimited partnership |
1942 | Merged with UBE INDUSTRIES, LTD. and started as UBE MACHINERY WORKS which was the machinery division of UBE INDUSTRIES, LTD. |
1967 | Install 30t electric arc-furnace and expand into large size of steel casting product |
1975 | Install 60t electric arc-furnace and continuous casting facilities and started to manufacture steel billet for steel bar etc. Capacity of steel casting product increased accordingly |
1980 | Install No.2 continuous casting facilities and increased billet production capacity to 40,000 ton/month. Install 10t & 20t low frequency furnace to manufacture high-quality cast iron product |
1986 | Install 60t refinery furnace to manufacture high-quality billet |
1989 | Established UBE STEEL CO., LTD. |
2002 | Acquired ISO9001 Certificate |
2005 | Acquired ISO14001 Certificate |
2007 | Acquired OHSAS18001 Certificate |
2010 | Certified as “Environmental Friendly Factory� by authority of Yamaguchi prefecture in Japan |